Kampe River Irrigation Scheme Phase III

  • Kampe River Irrigation Scheme Phase III

Project Description

The major features of this project include:

  • Earthfill dam with gross storage capacity of 250mcm,  1.976km length maximum height of 42.5m.
  • 250m wide concrete Ogee Spillway (ungated).
  • 25m height concrete Intake Tower with a double cell 4m x 5.2m Outlet Culvert.
  • 39km of unlined main canal with 87 major drainage structures
  • 4,100 hectares of irrigation distribution system with 259 nos turnout structures with control gates and reinforced concrete pipes for unit feeders.
  • Domestic Water Supply for Yagba Local Government

Our role on the Project included Detail Design, Preparation of Construction drawings, Work Programming, Monthly Work Valuation and general direction of the works.

CLIENT
The Federal Government of Nigeria
LOCATION
Ejiba, Kogi State, Nigeria
STORAGE CAPACITY
250MCM
STATUS
Completed, 1998
IRRIGATION DISTRIBUTION
4,100Ha
SPILLWAY
250m