Project Description

The design and construction supervision of rehabilitation of the main components of Goronyo Dam – Main Spillway structures, Stilling Basin, Upstream and Downstream Slopes, relief wells including stabilisation of dam shoulders.

The Project consists of

  • main dam with 5.2km crest length at 19m height
  • secondary dam with 1.5km crest length at 12m height and
  • the saddle dyke with 2.3km crest length at 9m height.

The dam has a reservoir capacity of 980MCM

Our role included Detail Design, Preparation of Construction drawings, Work Programming, Monthly Work Valuation and general direction of the works

CLIENT
The Federal Government of Nigeria
LOCATION
Goronyo, Sokoto State, Nigeria
RESERVOIR CAPACITY
980MCM
STATUS
Completed, 2004